Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
55.1%
OF COST SPENT
₹9.16 Cr spent
of ₹16.61 Cr sanctioned
₹7.46 Cr still to spend
on 524 ongoing works
Works ongoing
524
Open the list of these works →
Sanctioned
₹16.61 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.16 Cr
55.1% of sanction
Balance cost (unspent)
₹7.46 Cr
Wage₹1.79 Cr
Material₹5.66 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore