Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
15.3%
OF COST SPENT
₹21.47 L spent
of ₹1.41 Cr sanctioned
₹1.19 Cr still to spend
on 30 ongoing works
Works ongoing
30
Open the list of these works →
Sanctioned
₹1.41 Cr
Pure scheme (wage + material)
Expenditure since inception
₹21.47 L
15.3% of sanction
Balance cost (unspent)
₹1.19 Cr
Wage₹94.82 L
Material₹24.39 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore