Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
28.3%
OF COST SPENT
₹3.97 L spent
of ₹14.01 L sanctioned
₹10.04 L still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹14.01 L
Pure scheme (wage + material)
Expenditure since inception
₹3.97 L
28.3% of sanction
Balance cost (unspent)
₹10.04 L
Wage₹7.19 L
Material₹2.85 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh