Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
47.4%
OF COST SPENT
₹4.50 Cr spent
of ₹9.50 Cr sanctioned
₹5.00 Cr still to spend
on 126 ongoing works
Works ongoing
126
Open the list of these works →
Sanctioned
₹9.50 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.50 Cr
47.4% of sanction
Balance cost (unspent)
₹5.00 Cr
Wage₹3.06 Cr
Material₹1.94 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore