Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
0.1%
OF COST SPENT
₹1,140 spent
of ₹13.12 L sanctioned
₹13.11 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹13.12 L
Pure scheme (wage + material)
Expenditure since inception
₹1,140
0.1% of sanction
Balance cost (unspent)
₹13.11 L
Wage₹7.91 L
Material₹5.20 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh