Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
51%
OF COST SPENT
₹2.32 Cr spent
of ₹4.55 Cr sanctioned
₹2.23 Cr still to spend
on 61 ongoing works
Works ongoing
61
Open the list of these works →
Sanctioned
₹4.55 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.32 Cr
51% of sanction
Balance cost (unspent)
₹2.23 Cr
Wage₹1.56 Cr
Material₹67.08 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr