Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Bund
5.6%
OF COST SPENT
₹6.75 L spent
of ₹1.21 Cr sanctioned
₹1.14 Cr still to spend
on 18 ongoing works
Works ongoing
18
Open the list of these works →
Sanctioned
₹1.21 Cr
Pure scheme (wage + material)
Expenditure since inception
₹6.75 L
5.6% of sanction
Balance cost (unspent)
₹1.14 Cr
Wage₹72.51 L
Material₹41.95 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh