Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
64.9%
OF COST SPENT
₹17.75 Cr spent
of ₹27.36 Cr sanctioned
₹9.61 Cr still to spend
on 431 ongoing works
Works ongoing
431
Open the list of these works →
Sanctioned
₹27.36 Cr
Pure scheme (wage + material)
Expenditure since inception
₹17.75 Cr
64.9% of sanction
Balance cost (unspent)
₹9.61 Cr
Wage₹5.29 Cr
Material₹4.31 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore