Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
57.2%
OF COST SPENT
₹4.47 Cr spent
of ₹7.82 Cr sanctioned
₹3.35 Cr still to spend
on 120 ongoing works
Works ongoing
120
Open the list of these works →
Sanctioned
₹7.82 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.47 Cr
57.2% of sanction
Balance cost (unspent)
₹3.35 Cr
Wage₹1.01 Cr
Material₹2.34 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore