Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
4.2%
OF COST SPENT
₹10.16 L spent
of ₹2.43 Cr sanctioned
₹2.33 Cr still to spend
on 55 ongoing works
Works ongoing
55
Open the list of these works →
Sanctioned
₹2.43 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.16 L
4.2% of sanction
Balance cost (unspent)
₹2.33 Cr
Wage₹1.44 Cr
Material₹88.71 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh