Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
69.9%
OF COST SPENT
₹11.25 L spent
of ₹16.10 L sanctioned
₹4.85 L still to spend
on 9 ongoing works
Works ongoing
9
Open the list of these works →
Sanctioned
₹16.10 L
Pure scheme (wage + material)
Expenditure since inception
₹11.25 L
69.9% of sanction
Balance cost (unspent)
₹4.85 L
Wage₹3.16 L
Material₹1.69 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh