Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
45.2%
OF COST SPENT
₹26.87 Cr spent
of ₹59.40 Cr sanctioned
₹32.52 Cr still to spend
on 451 ongoing works
Works ongoing
451
Open the list of these works →
Sanctioned
₹59.40 Cr
Pure scheme (wage + material)
Expenditure since inception
₹26.87 Cr
45.2% of sanction
Balance cost (unspent)
₹32.52 Cr
Wage₹21.64 Cr
Material₹10.88 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore