Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
27.1%
OF COST SPENT
₹25.20 Cr spent
of ₹92.81 Cr sanctioned
₹67.61 Cr still to spend
on 6,745 ongoing works
Works ongoing
6,745
Open the list of these works →
Sanctioned
₹92.81 Cr
Pure scheme (wage + material)
Expenditure since inception
₹25.20 Cr
27.1% of sanction
Balance cost (unspent)
₹67.61 Cr
Wage₹39.17 Cr
Material₹28.45 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore