Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Cement Concrete Roads
66.5%
OF COST SPENT
₹4.15 L spent
of ₹6.25 L sanctioned
₹2.09 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹6.25 L
Pure scheme (wage + material)
Expenditure since inception
₹4.15 L
66.5% of sanction
Balance cost (unspent)
₹2.09 L
Wage₹58,123
Material₹1.51 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type