Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
2.8%
OF COST SPENT
₹80.48 L spent
of ₹28.62 Cr sanctioned
₹27.81 Cr still to spend
on 167 ongoing works
Works ongoing
167
Open the list of these works →
Sanctioned
₹28.62 Cr
Pure scheme (wage + material)
Expenditure since inception
₹80.48 L
2.8% of sanction
Balance cost (unspent)
₹27.81 Cr
Wage₹10.49 Cr
Material₹17.33 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore