Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
68.4%
OF COST SPENT
₹9.30 Cr spent
of ₹13.60 Cr sanctioned
₹4.30 Cr still to spend
on 79 ongoing works
Works ongoing
79
Open the list of these works →
Sanctioned
₹13.60 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.30 Cr
68.4% of sanction
Balance cost (unspent)
₹4.30 Cr
Wage₹2.40 Cr
Material₹1.90 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore