Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
55.6%
OF COST SPENT
₹42.78 L spent
of ₹76.97 L sanctioned
₹34.20 L still to spend
on 5 ongoing works
Works ongoing
5
Open the list of these works →
Sanctioned
₹76.97 L
Pure scheme (wage + material)
Expenditure since inception
₹42.78 L
55.6% of sanction
Balance cost (unspent)
₹34.20 L
Wage₹12.13 L
Material₹22.06 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh