Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
47.2%
OF COST SPENT
₹10.70 Cr spent
of ₹22.69 Cr sanctioned
₹11.99 Cr still to spend
on 742 ongoing works
Works ongoing
742
Open the list of these works →
Sanctioned
₹22.69 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.70 Cr
47.2% of sanction
Balance cost (unspent)
₹11.99 Cr
Wage₹3.48 Cr
Material₹8.51 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore