Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
36.4%
OF COST SPENT
₹10.41 Cr spent
of ₹28.62 Cr sanctioned
₹18.21 Cr still to spend
on 167 ongoing works
Works ongoing
167
Open the list of these works →
Sanctioned
₹28.62 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.41 Cr
36.4% of sanction
Balance cost (unspent)
₹18.21 Cr
Wage₹4.83 Cr
Material₹13.38 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore