Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
24.9%
OF COST SPENT
₹18.66 L spent
of ₹74.89 L sanctioned
₹56.23 L still to spend
on 23 ongoing works
Works ongoing
23
Open the list of these works →
Sanctioned
₹74.89 L
Pure scheme (wage + material)
Expenditure since inception
₹18.66 L
24.9% of sanction
Balance cost (unspent)
₹56.23 L
Wage₹45.68 L
Material₹10.55 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh