Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
0.1%
OF COST SPENT
₹1.05 L spent
of ₹9.02 Cr sanctioned
₹9.01 Cr still to spend
on 35 ongoing works
Works ongoing
35
Open the list of these works →
Sanctioned
₹9.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.05 L
0.1% of sanction
Balance cost (unspent)
₹9.01 Cr
Wage₹2.43 Cr
Material₹6.57 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost