Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
44.4%
OF COST SPENT
₹1.99 Cr spent
of ₹4.48 Cr sanctioned
₹2.49 Cr still to spend
on 37 ongoing works
Works ongoing
37
Open the list of these works →
Sanctioned
₹4.48 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.99 Cr
44.4% of sanction
Balance cost (unspent)
₹2.49 Cr
Wage₹77.04 L
Material₹1.72 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore