Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
3.1%
OF COST SPENT
₹14.05 L spent
of ₹4.55 Cr sanctioned
₹4.41 Cr still to spend
on 54 ongoing works
Works ongoing
54
Open the list of these works →
Sanctioned
₹4.55 Cr
Pure scheme (wage + material)
Expenditure since inception
₹14.05 L
3.1% of sanction
Balance cost (unspent)
₹4.41 Cr
Wage₹1.15 Cr
Material₹3.26 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore