Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
62%
OF COST SPENT
₹7.46 Cr spent
of ₹12.04 Cr sanctioned
₹4.58 Cr still to spend
on 68 ongoing works
Works ongoing
68
Open the list of these works →
Sanctioned
₹12.04 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.46 Cr
62% of sanction
Balance cost (unspent)
₹4.58 Cr
Wage₹66.96 L
Material₹3.91 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore