Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Percolation Tank
3.5%
OF COST SPENT
₹6.23 L spent
of ₹1.76 Cr sanctioned
₹1.70 Cr still to spend
on 20 ongoing works
Works ongoing
20
Open the list of these works →
Sanctioned
₹1.76 Cr
Pure scheme (wage + material)
Expenditure since inception
₹6.23 L
3.5% of sanction
Balance cost (unspent)
₹1.70 Cr
Wage₹96.39 L
Material₹73.62 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh