Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
39.1%
OF COST SPENT
₹1.31 Cr spent
of ₹3.35 Cr sanctioned
₹2.04 Cr still to spend
on 107 ongoing works
Works ongoing
107
Open the list of these works →
Sanctioned
₹3.35 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.31 Cr
39.1% of sanction
Balance cost (unspent)
₹2.04 Cr
Wage₹61.57 L
Material₹1.42 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore