Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGWell Recharge
44.2%
OF COST SPENT
₹86.49 L spent
of ₹1.96 Cr sanctioned
₹1.09 Cr still to spend
on 343 ongoing works
Works ongoing
343
Open the list of these works →
Sanctioned
₹1.96 Cr
Pure scheme (wage + material)
Expenditure since inception
₹86.49 L
44.2% of sanction
Balance cost (unspent)
₹1.09 Cr
Wage₹49.19 L
Material₹60.09 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh