Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
46.9%
OF COST SPENT
₹74.13 L spent
of ₹1.58 Cr sanctioned
₹83.82 L still to spend
on 27 ongoing works
Works ongoing
27
Open the list of these works →
Sanctioned
₹1.58 Cr
Pure scheme (wage + material)
Expenditure since inception
₹74.13 L
46.9% of sanction
Balance cost (unspent)
₹83.82 L
Wage₹32.95 L
Material₹50.86 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh