Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
2.7%
OF COST SPENT
₹5.40 L spent
of ₹1.97 Cr sanctioned
₹1.92 Cr still to spend
on 9 ongoing works
Works ongoing
9
Open the list of these works →
Sanctioned
₹1.97 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.40 L
2.7% of sanction
Balance cost (unspent)
₹1.92 Cr
Wage₹1.08 Cr
Material₹83.62 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh