Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
4.5%
OF COST SPENT
₹5.78 L spent
of ₹1.30 Cr sanctioned
₹1.24 Cr still to spend
on 114 ongoing works
Works ongoing
114
Open the list of these works →
Sanctioned
₹1.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.78 L
4.5% of sanction
Balance cost (unspent)
₹1.24 Cr
Wage₹87.07 L
Material₹36.93 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Bhind — Bhind ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh