Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
46.7%
OF COST SPENT
₹63.98 L spent
of ₹1.37 Cr sanctioned
₹73.05 L still to spend
on 18 ongoing works
Works ongoing
18
Open the list of these works →
Sanctioned
₹1.37 Cr
Pure scheme (wage + material)
Expenditure since inception
₹63.98 L
46.7% of sanction
Balance cost (unspent)
₹73.05 L
Wage₹24.71 L
Material₹48.34 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh