Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
1.5%
OF COST SPENT
₹21.28 L spent
of ₹13.75 Cr sanctioned
₹13.53 Cr still to spend
on 409 ongoing works
Works ongoing
409
Open the list of these works →
Sanctioned
₹13.75 Cr
Pure scheme (wage + material)
Expenditure since inception
₹21.28 L
1.5% of sanction
Balance cost (unspent)
₹13.53 Cr
Wage₹5.60 Cr
Material₹7.93 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore