Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Cement Concrete Roads
62.4%
OF COST SPENT
₹4.10 Cr spent
of ₹6.58 Cr sanctioned
₹2.48 Cr still to spend
on 194 ongoing works
Works ongoing
194
Open the list of these works →
Sanctioned
₹6.58 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.10 Cr
62.4% of sanction
Balance cost (unspent)
₹2.48 Cr
Wage₹1.55 Cr
Material₹92.49 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore