Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.1%
OF COST SPENT
₹42,545 spent
of ₹3.15 Cr sanctioned
₹3.14 Cr still to spend
on 29 ongoing works
Works ongoing
29
Open the list of these works →
Sanctioned
₹3.15 Cr
Pure scheme (wage + material)
Expenditure since inception
₹42,545
0.1% of sanction
Balance cost (unspent)
₹3.14 Cr
Wage₹94.62 L
Material₹2.20 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore