Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
10.7%
OF COST SPENT
₹33.39 L spent
of ₹3.12 Cr sanctioned
₹2.79 Cr still to spend
on 51 ongoing works
Works ongoing
51
Open the list of these works →
Sanctioned
₹3.12 Cr
Pure scheme (wage + material)
Expenditure since inception
₹33.39 L
10.7% of sanction
Balance cost (unspent)
₹2.79 Cr
Wage₹1.13 Cr
Material₹1.65 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh