Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
32.6%
OF COST SPENT
₹13.32 L spent
of ₹40.83 L sanctioned
₹27.50 L still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹40.83 L
Pure scheme (wage + material)
Expenditure since inception
₹13.32 L
32.6% of sanction
Balance cost (unspent)
₹27.50 L
Wage₹18.70 L
Material₹8.80 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh