Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Recharge Pits
40.6%
OF COST SPENT
₹58.15 L spent
of ₹1.43 Cr sanctioned
₹84.91 L still to spend
on 86 ongoing works
Works ongoing
86
Open the list of these works →
Sanctioned
₹1.43 Cr
Pure scheme (wage + material)
Expenditure since inception
₹58.15 L
40.6% of sanction
Balance cost (unspent)
₹84.91 L
Wage₹41.45 L
Material₹43.46 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh