Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
0.9%
OF COST SPENT
₹24.31 L spent
of ₹26.03 Cr sanctioned
₹25.79 Cr still to spend
on 802 ongoing works
Works ongoing
802
Open the list of these works →
Sanctioned
₹26.03 Cr
Pure scheme (wage + material)
Expenditure since inception
₹24.31 L
0.9% of sanction
Balance cost (unspent)
₹25.79 Cr
Wage₹10.61 Cr
Material₹15.18 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore