Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
44.8%
OF COST SPENT
₹58.46 L spent
of ₹1.30 Cr sanctioned
₹71.95 L still to spend
on 5 ongoing works
Works ongoing
5
Open the list of these works →
Sanctioned
₹1.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹58.46 L
44.8% of sanction
Balance cost (unspent)
₹71.95 L
Wage₹20.95 L
Material₹51.00 L