Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
53.3%
OF COST SPENT
₹7.34 Cr spent
of ₹13.78 Cr sanctioned
₹6.44 Cr still to spend
on 410 ongoing works
Works ongoing
410
Open the list of these works →
Sanctioned
₹13.78 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.34 Cr
53.3% of sanction
Balance cost (unspent)
₹6.44 Cr
Wage₹1.85 Cr
Material₹4.59 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore