Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.3%
OF COST SPENT
₹2.56 L spent
of ₹8.26 Cr sanctioned
₹8.23 Cr still to spend
on 108 ongoing works
Works ongoing
108
Open the list of these works →
Sanctioned
₹8.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.56 L
0.3% of sanction
Balance cost (unspent)
₹8.23 Cr
Wage₹3.21 Cr
Material₹5.02 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr