Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
8.8%
OF COST SPENT
₹2.60 Cr spent
of ₹29.55 Cr sanctioned
₹26.94 Cr still to spend
on 326 ongoing works
Works ongoing
326
Open the list of these works →
Sanctioned
₹29.55 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.60 Cr
8.8% of sanction
Balance cost (unspent)
₹26.94 Cr
Wage₹15.25 Cr
Material₹11.69 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore