Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
29.9%
OF COST SPENT
₹15.20 L spent
of ₹50.92 L sanctioned
₹35.72 L still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹50.92 L
Pure scheme (wage + material)
Expenditure since inception
₹15.20 L
29.9% of sanction
Balance cost (unspent)
₹35.72 L
Wage₹17.59 L
Material₹18.13 L