Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
6.1%
OF COST SPENT
₹2.42 L spent
of ₹39.51 L sanctioned
₹37.09 L still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹39.51 L
Pure scheme (wage + material)
Expenditure since inception
₹2.42 L
6.1% of sanction
Balance cost (unspent)
₹37.09 L
Wage₹26.39 L
Material₹10.70 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh