VBGRAMGConstr of Compound wall
0.5%
OF COST SPENT
₹23.39 L spent
of ₹51.62 Cr sanctioned
₹51.39 Cr still to spend
on 966 ongoing works
Works ongoing
966
Open the list of these works →
Sanctioned
₹51.62 Cr
Pure scheme (wage + material)
Expenditure since inception
₹23.39 L
0.5% of sanction
Balance cost (unspent)
₹51.39 Cr
Wage₹17.07 Cr
Material₹34.31 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost