Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGWorks for Flood Control and Protection
46.9%
OF COST SPENT
₹1.55 L spent
of ₹3.31 L sanctioned
₹1.76 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹3.31 L
Pure scheme (wage + material)
Expenditure since inception
₹1.55 L
46.9% of sanction
Balance cost (unspent)
₹1.76 L
Wage₹1.35 L
Material₹40,731
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh