Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
4.5%
OF COST SPENT
₹1.07 L spent
of ₹23.47 L sanctioned
₹22.40 L still to spend
on 11 ongoing works
Works ongoing
11
Open the list of these works →
Sanctioned
₹23.47 L
Pure scheme (wage + material)
Expenditure since inception
₹1.07 L
4.5% of sanction
Balance cost (unspent)
₹22.40 L
Wage₹10.97 L
Material₹11.43 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr