Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
40.2%
OF COST SPENT
₹1.19 Cr spent
of ₹2.96 Cr sanctioned
₹1.77 Cr still to spend
on 71 ongoing works
Works ongoing
71
Open the list of these works →
Sanctioned
₹2.96 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.19 Cr
40.2% of sanction
Balance cost (unspent)
₹1.77 Cr
Wage₹1.54 Cr
Material₹22.53 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown