Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Compound wall
27%
OF COST SPENT
₹8.49 L spent
of ₹31.48 L sanctioned
₹22.99 L still to spend
on 21 ongoing works
Works ongoing
21
Open the list of these works →
Sanctioned
₹31.48 L
Pure scheme (wage + material)
Expenditure since inception
₹8.49 L
27% of sanction
Balance cost (unspent)
₹22.99 L
Wage₹16.24 L
Material₹6.75 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh