Data as of 29 Oct 2026, 07:04 Admin login
FY
Reset

Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
14.6%
OF COST SPENT
₹1.86 L spent
of ₹12.72 L sanctioned
₹10.86 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹12.72 L
Pure scheme (wage + material)
Expenditure since inception
₹1.86 L
14.6% of sanction
Balance cost (unspent)
₹10.86 L
Wage₹2.03 L
Material₹8.84 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh